Home appliances

Source air conditioners from China

Air conditioning equipment must be sized and installed for the building and climate. Source by calculated load, room constraints, supply and supported refrigerant. Compare exact indoor and outdoor combinations using capacity, efficiency, operating conditions and installation support.

Modern wall-mounted split air conditioner beside matching outdoor unit

Air Conditioners by application

Choose the format that fits your buyer’s environment, operating requirements and support plan. Use the exact model identifier in every quotation and sample request.

Wall-mounted split system

Confirm room load, line set, indoor placement and outdoor clearance.

Multi-zone split system

Verify approved combinations, piping limits and simultaneous operation with the installer.

Portable or window system

Assess window or vent kit, condensate, efficiency assumptions and noise during intended use.

Inside and outside the product

Explore the enclosure, interfaces and internal assembly. Open each component to see what it does and which design details affect sourcing.

Cutaway of air conditioners showing indoor coil and blower, outdoor coil and compressor, expansion and piping, control and inverter board
Original generated concept image. Component layout varies by design and supplier.
Indoor coil and blower

Exchange heat with room air and distribute it through the indoor unit.

Outdoor coil and compressor

Exchange heat outside and circulate refrigerant. Their ratings depend on intended outdoor conditions.

Expansion and piping

Meter refrigerant flow and connect approved combinations.

Control and inverter board

Manage compressor, fan, temperature and optional network functions.

Filters, housing and drains

Affect air quality, maintenance, water removal and installation.

Air Conditioners specification table

Ask each supplier to state a proposed value, supporting evidence and any deviation for the exact model it quotes. Measure samples under the same operating conditions before confirming the final configuration.

ParameterSpecify or request from the supplier
System loadProvide room size, climate, design load, occupancy, hours and heating or cooling targets.
Capacity and efficiencyRequire performance data and test conditions for the paired indoor and outdoor model.
Refrigerant and linesSpecify type, charge, permitted lengths, elevation, valves and service.
ElectricalAgree voltage, supply, branch and startup requirements and operating range.
التركيبDefine mount, clearance, drainage, noise, indoor unit count and qualified service.
SupportAsk for controller, fan, board, filters, warranty and parts identity.

Compare the offer line by line

Compare required lines, brackets, installation, spares and warranty separately. Clarify commissioning and whether local support exists for the refrigerant and controller.

Record unit price, minimum order by configuration, sample cost, lead time and quoted handover terms. Use the China import quotation checklist to compare the cost and inclusions of each offer.

From sample to shipment inspection

Agree the sample, test method and acceptance limits before releasing a production order. Build the report around the product’s expected use and the components that can change between lots.

  1. System qualification

    Review sizing and operating points with the responsible installer. Test approved combinations and controls in the agreed configuration.

  2. Production release

    Freeze indoor and outdoor models, refrigerant, electronics and label. Confirm installation and part documentation.

  3. Shipment inspection

    Verify paired units, seals, included accessories and model records. Check packing and sample agreed functions.

See how supplier selection and inspection coordination fit into the MOEWORLDWIDE sourcing process.

Documentation, packing and export

Document review

Review applicable destination refrigeration rules, energy labels and electrical or radio evidence. Request exact refrigerant and charge and consult the installer and freight coordinator for configuration-specific handling.

Freight and carton details

Identify paired indoor and outdoor units and refrigerant documentation by carton. Confirm orientation, required lifting, valve protection and consolidated freight dimensions.

Confirm the commercial invoice, packing list, delivery term, cargo handover and any destination-specific documents with the parties responsible for the shipment.

Request a sourcing quote for air conditioners

Share the details below so MOEWORLDWIDE can compare offers on the same scope, including the supplied configuration, documentation, inspections and delivery terms.

  • Application and market. Identify the wall-mounted split system, multi-zone split system or another configuration you are evaluating, and name the destination country and receiving city or port.
  • Product specification. Include your target values for system load, capacity and efficiency, refrigerant and lines and attach a current drawing, reference unit or datasheet if available.
  • Order and packaging. List quantity by model, trial order size, likely repeat volume, required pack languages, accessories and target delivery date.
  • Evidence and terms. List required reports, sample approvals, inspection scope, warranty expectations and preferred freight handover point.
Chat Now
MOEWORLDWIDE

Trade Support Center

قم بالتمرير إلى الأعلى